7. Model Input Data

This section describes generating inputs for a MINEDW model using interface menus and tool buttons. The model input process encompasses all essential components for groundwater flow simulation setup, including:

  • Project Definition: Setting up the basic project parameters and coordinate systems

  • Model Geometry: Defining the spatial framework and mesh structure for the simulation

  • Zone Properties: Assigning hydrogeologic properties to different material zones

  • Initial Conditions: Setting starting hydraulic head distributions throughout the model domain

Each component builds upon previous steps to create a comprehensive groundwater flow model for mining hydrogeology applications.

The following chapters cover each aspect of model input: